TEL: +86-132-80060602
Categories
Contact Us

Liangshan CIMC Dongyue Vehicles Co.,Ltd

Add: Quanpu Industrial Zone, Liangshan County, Jining, Shandong, China (Mainland)

Contact us: Milo Yue

Tel: +86-531-89605605

Fax: +86-531-89605605

Mobile: +86-13280060602

E-mail: globalsales@cimcchina.com

News
Home > News > Content
Semi-trailer Tanker Transport Vehicle Heating System
Sep 10, 2018

When transporting medium of a higher freezing point,heating system can be installed on the tank.The medium can be heated through the heating pipeline, so as to facilitate the discharge.

Note: it is outlet  if it is equipped with drain valve,and it is inlet if it is not equipped with drain valve. The maximum vapor pressure pressure permitted in heating the pipeline is 8kg/cm².

When partial liquid solidification in the tanker discharge port leading to difficulties in unloading,the heating pipe at the discharge pipe can be used,the tank can be heated by steam heating ,and it is prohibited to use fire baking.


  • Contact Us

    Liangshan CIMC Dongyue Vehicles Co.,Ltd

    Add: Quanpu Industrial Zone, Liangshan County, Jining, Shandong, China (Mainland)

    Contact us: Milo Yue

    Tel: +86-531-89605605

    Fax: +86-531-89605605

    Mobile: +86-13280060602

    E-mail: globalsales@cimcchina.com

  • Categories
  • Copyright © Liangshan CIMC Dongyue Vehicles Co.,Ltd All Rights Reserved.